Skip to Main Navigation

China - Second Fujian Highway Project (Vol. 2) : Zhangzhou-Zhaoan Expressway : Environmental Action Plan (Português)

This report includes environmental impact assessments and action plans for the Second Fujian Highway Project, which constructs the Zhangzhou-Zhao'an Expressway and an interconnecting road and bridge program to relieve traffic congestion and improve the mobility and integration of inter-provincial trade, commerce, and tourism between Fujian and Guangdong provinces. Negative environmental impact mitigation include: Road surfaces, excavation areas, and construction sites will be sprayed with water and kept moist. Trucks will be distanced from residential sites or other sensitive spots. Ventilation fans will reduce air pollution. Asphalt mixing equipment will have dust collectors and be distanced from residential areas. Vegetation restoration including greenbelts on roadsides will rehabilitate the land. Afforestation, a soundproofing screen, and a restricted schedule for operating construction equipment and vehicles will reduce noise levels. Dumping levels will not exceed the surrounding ground level, intercepting ditches will be installed, blind pipes will discharge seepage, and borrow and spoil sites will be reconstructed or leveled after construction. To prevent water pollution, oil collection tanks, oil-water separators, garbage collecting stations, drainage gates, and controlled sand digging will be used, along with treatment of wastewater and sewage. Hazardous materials will be strictly monitored. Displaced persons will be resettled and compensated.

Detalhes

  • Autor

    Xian Highway Transportation University, Fujian Pr

  • Data do documento

    1999/04/30

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E254

  • Nº do volume

    2

  • Total Volume(s)

    9

  • País

    China,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Zhangzhou-Zhaoan Expressway : Environmental Action Plan

  • Palavras-chave

    animals,aquatic plants,aqueducts,asphalt,Chemical Oxygen Demand,COD,Construction,construction stage,construction work,discharge,Dissolved Oxygen,ditches,domestic sewage,drainage,drainage system,earthworks,ecosystem,electricity,Environmental Impact,Environmental Impact Assessment,environmental issues,ENVIRONMENTAL MANAGEMENT,ENVIRONMENTAL MONITORING,ENVIRONMENTAL PROTECTION,farmers,farming,garbage,gas,irrigation,irrigation canals,irrigation channels,irrigation water,land use,mixers,Nitrogen,pH,pollution,ponds,Quality Standards,rainy seasons,retaining walls,River System,rivers,runoff,runoff water,sand,Sanitation,screens,Sea,Sea water,Seawater,septic tanks,sewage,sewage disposal,Ships,silting,soil erosion,surface water,surface water quality,surface waters,Suspended Particles,tanks,toxic substances,trees,washing,waste,wastewater,water content,water pollution,water quality

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.