Detalhes
-
Autor
-
Data do documento
2020/06/29
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR42543
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/06/29
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Transport Connectivity and Asset Management Project - P132833 - Sequence No : 09
-
Palavras-chave
Institutional Strengthening and Capacity Building; asset management system; Road Sector Policy; provincial road; Investment Project Financing; reduction of cost; road safety; road development; road link; operation risk; risk category; new investment; gradual opening; project finance; value use; b roads; risk assessment; pavement management; road map; local value; local contractor; value engineering; Resource Efficiency; road service; road section; home affairs; female workers; separate asset; civil works; operational module; democratic socialist
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.