Detalhes
-
Autor
-
Data do documento
2021/06/28
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR47035
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/06/28
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Integrated Transport - P102368 - Sequence No : 25
-
Palavras-chave
urban road infrastructure investment; centralized traffic control; financial management reporting; number of complaints; average travel time; vehicle operating cost; length of road; Investment Project Financing; finance and economic; road section; Urban Infrastructure; road sector; Output and Performance Based; construction work; operation risk; risk category; Road Accidents; project road; road condition; movement restriction; project intervention; baseline data; result indicator; proposal validity; procurement process; institutional strengthening; work contracts; rural transportation infrastructure
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.