Detalhes
-
Autor
-
Data do documento
2021/09/29
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR48369
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/09/29
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Capacity Augmentation of the National Waterway- 1 (JAL MARG VIKAS) Project - P148775 - Sequence No : 08
-
Palavras-chave
vessel design; inland water transport; Investment Project Financing; inland waterway transport; new legal framework; modal terminal; transport efficiency; risk assessment; vessel operation; investment climate; institutional strengthening; ongoing work; national capacity; capacity enhancement; operational framework; transport operation; operation risk; risk category; cargo traffic; result indicator; based contracts; navigational activity; response time; skill mix
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.