Georgia - Second Regional and Municipal Infrastructure Development Project : Environmental Assessment (Vol. 28) : Environmental and social screening and environmental management plan for Kobuleti seawall rehabilitation (Inglês)

The objective of the Second Regional and Municipal Infrastructure Development Project for Georgia is to improve access to and quality of municipal services and infrastructure. Some of the negative impacts and mitigation measures include: revision of vehicles will be required to ensure that there is no leakage of fuel and lubricating materials. All machinery will be maintained and operated such that all leaks and spills of materials will be minimized. Daily plant checks (vehicle maintenance procedure) will be undertaken to ensure no leaks or other problems are apparent. Vehicle maintenance, cleaning, degreasing etc. will be undertaken in designated areas, of hard-standing, not over made ground. Maintenance points will not be located within 50m of any watercourse; lubricants, fuel and solvents should be stored and used for servicing machinery exclusively in the designated sites, with adequate lining of the ground and confinement of possible operation and emergency spills. Spill containment materials (sorbents, sand, sawing, chips etc.) should be available on construction site; waste collection and disposal pathways and sites will be identified for all major waste types expected from construction activities; mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers; contractor will be required to submit to the MDF copies of the licenses, permits, written agreements, certificates, etc. to prove that all materials are obtained from licensed providers; and reinstate used sections of quarries and/or borrowing areas as extraction proceeds on or properly close quarries if extraction completed and license expired.

Detalhes

  • Autor

    Georgia

  • Data do documento

    2018/04/27

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    SFG3121

  • Nº do volume

    28

  • Total Volume(s)

    38 (Ver todos os volumes)

  • País

    Geórgia,

  • Região

    Europa e Ásia Central,

  • Data de divulgação

    2018/04/27

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental and social screening and environmental management plan for Kobuleti seawall rehabilitation

  • Palavras-chave

    sea wall;construction waste;construction site;construction inspection;traffic and pedestrian;disposal of construction waste;mitigation measure;public consultation;local population;vehicle maintenance;negative environmental impact;acquisition of land;water;construction material;national regulatory system;risk of damage;water supply system;solid waste transport;displacement of people;transfer of land;international good practice;local traffic police;wastewater treatment system;disposal of waste;large trees;unintentional damage;inert material;truck load;consultation meeting;warning signs;construction phase;Public Services;local municipality;construction work;local resident;work schedule;construction machinery;concrete block;pedestrian access;written agreement;concrete slab;social accountability;concrete wall;wave height;wave power;sediment control;heavy rain;storage area;atmospheric air;permanent loss;local legislation;pine trees;cover material;waste collection;waste type;river bed;construction activities;chemical waste;public use;residential building;emergency situation;waste dumping;environmental review;land use;Waste Material;land acquisition;medical waste;protected area;private property;natural environment;accessible site;toxic material;safety glass;demolition debris;open burn;historic building;water quality;site map;safeguard specialist;air compressor;consultation process;air temperature;air flow;lease agreement;average wind;storm event;mechanical equipment;residential area;heavy machinery;social impact;long-term sustainability;personal safety;recreational value;work accident;procurement rule;listed species;land take;access road;construction accident;wave breaker;protective barrier;local self government;social issue;reporting procedure;environmental monitoring;construction contractor;environmental requirement;urban landscape;hard copy;participant information;landfill site;social environment;positive impact;information dissemination;reference material;aquatic life;stone fill;transport activity;rush hour;livestock movement;vehicle speed;work force;concrete mix;traffic disruption;works contract;financially support;international donor;safe passage;water pollution;land plot;heavy traffic;supply schedule;equipment failure;fuel spill;traffic diversion;national regulation;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.