The Highway Project for Bechuanaland will assist in the development of the transportation system in Bechuanaland. It will consists of three parts: (i) the design, construction and reconstruction of three roads totaling 355 miles in length, (ii) betterment of the main north-south road; and (iii) the strengthening and expansion of the highway maintenance organization. The first component will improve the road from Vleischfontein on the border of the Republic of South Africa to Gaberones, while the second will replace the existing road between the town of Serowe and the railhead at Palapye. The project will lead to economic development, and reduce transport cost for existing and future traffic of a primarily agricultural economy.
Detalhes
-
Data do documento
1964/07/31
-
TIpo de documento
Relatório sobre Avaliação do Pessoal
-
No. do relatório
TO405
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Bechuanaland - Highway Project
-
Palavras-chave
average rate of return;scheme will;length of road;source income;grants in aid;average daily traffic;foreign currency expenditure;source of income;road system;traffic density;gravel surface;shoulder width;road maintenance;copper deposit;horizontal curve;mineral export;crown land;experimental road;railway reserve;main road;branch road;agricultural economy;annual budget;repair shop;dry regions;monetary term;narrow bridge;hazardous locations;secondary road;ida mission;project road;road train;gravel road;technical competence;cattle grid;local contractor;transport cost;livestock industrial;livestock industry;road link;rail crossing;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.