Detalhes
-
Autor
-
Data do documento
2020/12/28
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR44899
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/12/28
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Enhancing Infrastructure Efficiency and Sustainability - P163760 - Sequence No : 06
-
Palavras-chave
infrastructure efficiency; public building; waste management plan; national road network; asset management plan; number of workers; series of workshops; road maintenance management; procurement of materials; road sector reform; disbursement linked indicators; program development; road asset; environmental compliance; rolling basis; road safety; Public Infrastructure; general elections; Software Installation; organizational arrangement; evaluation system; supply chain; contract packages; legal change; legal requirement; legal framework; building regulation; restrictive measures; survey questionnaire; procurement staff; budget control; loan proceeds; renovation work; satisfaction rate; socioeconomic benefits; building performance; co2 emission; safety measure; reconstructed buildings; energy performance; rehabilitation activities; longer period; parliamentary election; program monitoring; Social Welfare; temporary suspension; border closure; in work; ongoing work; building renovation; risk category; operation risk; international consultant; Financing programmes; finance program; organizational change; budget fund; expenditure efficiency; Homebased Work; government capacity; epidemic situation
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.