The Mahakali Irrigation Project was achieved. The Bank relationships with the Government of Nepal, local government and the Project Authority have been good. Consistent International Development Association (IDA) attention to the project contributed to its success. The project achieved its goals even though the physical targets were revised during project implementation due to changes in both the scope of the project and the procurement mode for the main civil works contract. The weaknesses identified in project implementation were: (a) lack of structured incentives for farmers to be more involved in the project cycle from an early stage; for example, formation of effective WUGs and construction of field channels by farmer groups were less effective before a timely and reliable water supply was provided, and (b) inadequate project preparation as evidenced by the mapping error and lack of a realistic assessment of the relative feasibility of Local Competitive Bidding (LCB) and International Competitive Bidding (ICB) civil works contracts. The lessons derived from this experience have been incorporated in the formulation of the follow-on project.
Detalhes
-
Data do documento
1990/09/28
-
TIpo de documento
Relatório de Conclusão do Projeto.
-
No. do relatório
9022
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Nepal - Mahakali Irrigation Project
-
Palavras-chave
Drainage systems; Experimental farms; Feeder roads; Fellowships; Irrigation systems; Staff housing; Training centers
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.