Detalhes
-
Autor
-
Data do documento
2020/07/19
-
TIpo de documento
Environmental and Social Review Summary
-
No. do relatório
ESRSC01492
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/07/19
-
Disclosure Status
Disclosed
-
Nome do documento
Concept Environmental and Social Review Summary (ESRS) - Resilient Infrastructure Building Project - P173312
-
Palavras-chave
Environmental and Social Management Framework; material need; Environmental and Social Review Summary; aquatic flora and fauna; local government engineering; community health and safety; disaster risk management; sustainable management; client needs; construction of access road; construction of flood shelter; civil works; dam; displacement of people; early warning system; movement of vehicle; construction and rehabilitation; code of conduct; government primary school; community disaster preparedness; contractor for works; gender based violence; Social Impact Assessment; negative environmental impact; road safety plan; safety and health; safety of people; use of land; risk of transmission; social risk assessment; cultural heritage site; ground water pollution; sanitation and hygiene; safety of worker; codes of practice; Disaster Risk Mitigation; operation of dams; finance infrastructure; capacity strengthening; community land; labor influx; ethnic community; construction material; private land; connecting road; water bodies; high flood; Solar Power; storage facility; construction activities; contingency plan; sea level; safeguard policy; Safeguard Policies; water pump; flood resilience; stakeholder engagement; construction area; environmental risk; flood time; community space; air emission; construction phase; water stress; surface water; construction period; water level; surrounding community; river flow; social issue; major river; community access; in school; noise pollution; local river; school committee; displaced person; child right; elected representative; water logging; indigenous people; school building; coverage area; contract worker; mitigation plans; general assessment; short-term impact; resettlement policy; short term impact; vulnerable group; gender concern; project plan; urban neighborhood; local demand; urban setting; rural village; Indigenous Peoples; health clinics; adequate water; construction camp; community facility; physical characteristic; social screening; involuntary resettlement; labor camp; Natural Resources; alternative school; available land; coastal region; mountain range; high precipitation; construction work; project datum; borrower's commitment; financial intermediaries; tangible object; community for use; project costing; subproject implementation; participation process; Environmental Assessment; rural population; physical environment; rural community; rainwater harvesting; vehicle maintenance; project intervention; dust suppression; construction site; local ecosystems; monsoon flood; downstream ecosystem; river morphology; cause harm; physical construction; community engagement; community level; land area; heavy rainfall; land use; extensive consultation; dry period; down stream; traditional culture; water availability; specific traffic; traffic movement; physical barrier; public awareness
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.