Tanzania - Rural Electrification Expansion Project : environment and social systems assessment (Inglês)

The objectives of the Rural Electrification Expansion Project for Tanzania are: (i) to increase the number of rural electricity connections; and (ii) scale-up renewable electricity generation in rural areas. Some of the negative impacts and mitigation measures include: ensure sustainability, security and the equitable use of resources without degrading the environment or risking health or safety; prevent and control degradation of land, water, vegetation and air; conserve and enhance the natural and manmade heritage, including biological diversity of the unique ecosystems of Tanzania; improve the condition and productivity of degraded areas, including rural and urban settlements; raise public awareness and understanding of the essential linkages between environment and development, and promote individual and community participation in environmental action; and promote international cooperation on the environmental agenda.

Detalhes

  • Data do documento

    2016/04/11

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    102183

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Tanzânia,

  • Região

    África,

  • Data de divulgação

    2016/04/21

  • Disclosure Status

    Disclosed

  • Nome do documento

    Tanzania - Rural Electrification Expansion Project : environment and social systems assessment

  • Palavras-chave

    Power and Gas Sector Development Policy Operation;vulnerable group;rural area;Environmental and Social Management System;energy and water;grid extension;access to modern energy service;land acquisition;Environmental and Social Impact Assessment;renewable energy project developer;number of household connections;Electricity;off-grid electrification;Access to Electricity;cost of electricity generation;access to energy service;voluntary participation;rights of indigenous people;workplace health and safety;Access to Information Policy;environmental and social assessments;generation capacity;rural electricity connection;stakeholder consultation;renewable electricity;connection fee;investment program;rehabilitation of infrastructure;rights of way;Solar Home System;significant adverse impact;operation of facility;physical cultural resources;small power producer;criteria for selection;disbursement of fund;provision of material;grievance redress mechanism;land law;environmental assessment process;transmission and distribution;long-term economic growth;forms of energy;natural gas reserves;loss of asset;acquisition of land;technical assistance program;risk management approach;availability of finance;payment of compensation;peak demand period;national rural electrification;private sector investor;clean water supply;debt service obligation;number of beneficiaries;independent power producer;disbursement linked indicators;private sector delivery;electricity connection fee;poverty reduction plan;reduction of income;biomass gasification system;Gender and HIV;rural distribution network;land acquisition procedures;management weaknesses;gdp growth rate;ambitious rural electrification;procurement management unit;efficiency of operations;rural electrification program;institutional capacity assessment;women headed household;mobilization of resource;benefits of electrification;small hydro plant;social and environmental;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.