Detalhes
-
Data do documento
2013/12/01
-
TIpo de documento
Folhas de Dados Integradas sobre Salvaguardas
-
No. do relatório
84783
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2014/02/19
-
Disclosure Status
Disclosed
-
Nome do documento
Solomon Islands - Additional Financing for the Sustainable Energy Project
-
Palavras-chave
Independent Panel of Experts;degradation of critical natural habitats;safeguard policy;Safeguard Policies;Environmental and Social Impact;housing for the poor;physical cultural resources;Public Sector Governance;quality and quantity;response to crisis;construction and operation;Broad Community Support;public consultation process;efficiency of electricity;power line;involuntary resettlement;power system;land acquisition;residential area;safeguard issue;Capital Investments;power cable;soil erosion;mitigation measure;public road;public awareness;notification requirement;international aspect;dam safety;commercial harvest;certification system;Electric Power;productive use;public meeting;project finance;airport boundary;land lease;industrial zone;system control;safeguard analysis;physical characteristic;irreversible impacts;dispatch centre;energy specialist;transmission line;noise level;engineering service;project datum;sustainable energy;distribution network;Energy Sector;urban service;operational efficiency;financial sustainability;public place;diesel generation;capital expenditure;generation capacity;resettlement plan;cultural property;safeguard specialist;media coverage;electricity consumer;power supply;project costing;local ngo;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.