Skip to Main Navigation

Disclosable Restructuring Paper - EC Manta Public Services Improvement Project - P143996 (Inglês)

The development objective of Manta Public Services Improvement Project for Ecuador is to support the Municipality of Manta in increasing the quality and sustainability of public services for water, sanitation and urban mobility. This restructuring would comprise: (i) a one-year extension of the project closing date from June 30, 2018 to June 30, 2019, to allow sufficient time for the completion of planned activities, and ultimately, full achievement of the project development objective (PDO); (ii) changes in the disbursement estimates and implementation schedule, to reflect actual progress achieved and to accommodate them to the extended closing date; (iii) a reallocation of loan proceeds between disbursement categories to allow for the financing of incremental costs associated to additional wastewater management infrastructure to be developed under the project; and (iv) changes in the results framework of the project and the methodology for the economic analysis that was employed at appraisal, to reflect variations in the scope of planned activities and to better capture results and positive impacts that were not captured in the original results framework and economic analysis.

Detalhes

  • Autor

    Sanz Uriarte,Zael

  • Data do documento

    2018/05/09

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    RES31362

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Equador,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2018/05/09

  • Disclosure Status

    Disclosed

  • Nome do documento

    Disclosable Restructuring Paper - EC Manta Public Services Improvement Project - P143996

  • Palavras-chave

    water supply and sanitation service; investment in water supply; quality of water supply service; economic and financial analysis; raw water pumping station; urban mobility; integrated water resources management; water supply and sewerage; allocation of loan proceeds; investment in road; availability of water supply; water and sewerage service; number of water connections; restoration of water supply; incremental cost; result indicator; bill collection efficiency; water distribution system; road asset management; water treatment plant; management improvement program; annual road maintenance; results framework; national water authority; Advance Payment Guarantee; urban transport service; wastewater management infrastructure; capacity building support; local government authority; reallocation of fund; emergency response activity; continuity of service; number of lanes; drinking water reservoirs; water distribution network; number of beneficiaries; water supply infrastructure; drinking water production; public transport service; flow of vehicle; real estate property; road safety plan; local financial market; urban road safety; rehabilitation activities; data management; low-income neighborhood; account receivable; urban street; household water; pedestrian mobility; sewerage connection; management cost; procurement process; urban upgrade; working ratio; consulting service; Consulting services; reconstruction fund; intermediate outcome; financial sustainability; Traffic Control; road improvement; tree planting; sidewalk light; temporary bridge; delinquency rate; operational expense; River basin; private operator; laboratory equipment; road traffic; sidewalk width; outcome indicator; data capture; emergency repair; data reliability; pedestrian sidewalk; pumping system; street vendor; construction work; assessment methodology; corrective maintenance; disabled people; bike lane; bus stop; vehicle type; flow control; water column; street furniture; electrical wiring; cyclist mobility; light industry; good lighting; environmental factor; award recommendation; financial execution; Public Services; water global; institutional strengthening; municipal authority; positive impact; applicable legislation; business process; laboratory building; street network; budget process; municipal planning; wastewater pumping; telecommunication service; qualification criteria; financial efficiency; nonrevenue water; property valuation; learning curve; commercial areas; weather condition; sewer connection; project intervention; street paving; commercial performance; commercial management; commercial activity; reconstruction activities; utility performance; pipe material; water loss; Pedestrian traffic; operational performance; disbursement rate; local engineering; urban development; street light; national authority; financing source; applicable regulation; operational efficiency; municipal government; local expert; affected population

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.