Detalhes
-
Autor
-
Data do documento
2020/05/29
-
TIpo de documento
Environmental and Social Management Plan
-
Nº do volume
1
-
País
Egito, República Árabe do
-
Região
-
Data de divulgação
2020/05/29
-
Disclosure Status
Disclosed
-
Nome do documento
Environmental and Social Management Framework (ESMF) Egypt: Greater Cairo Air Pollution Management and Climate Change Project (P172548)
-
Palavras-chave
Annual Work Plan and Budget; solid waste management master plan; environmental and social assessment study; ambient air quality; Environmental and Social Impact; gender based violence; operation and maintenance cost; cleaner production technology; reduction of vehicle emission; Risks and Mitigation Measures; community health and safety; monitoring and evaluation system; water and wastewater; vehicle emission reduction; hazardous waste management; combat climate change; waste management infrastructure; social risk management; criteria for selection; regulatory authority; solid waste collection; decision support system; social and environmental; capacity building program; mode of transport; energy and water; personal protective equipment; public transport sector; cost recovery mechanism; waste collection points; public awareness campaign; solid waste recycling; capacity building need; Financial Management System; poor waste management; short-lived climate pollutants; air pollution management; sustainable development goals; greenhouse gas emission; construction and operation; ambient noise level; fine particulate matter; world health organization; emergency response plan; nationally determine contribution; local air quality; types of wastes; hazardous waste treatment; hazardous waste facility; healthcare waste management; public awareness activity; solid waste service; urban public transport; other transport modes; gap analysis; transfer station; power supply; water bodies; public bus; open burn; electric bus; stakeholder engagement; behavioral change; awareness raising; disposal facility; value chain; treatment facilities; public consultation; ghg emissions; lung health; institutional framework; national legislation; built environment; Public Transportation; educational center; sterilization equipment; improve waste; risk assessment; clean transport; university hospital; land transport; private contractor; first year; Capital Investments; legal framework; living condition; concerned parties; environmental audit; corrective action; project intervention; air emission; air pollutant; construction phase; greenhouse gasses; natural environment; safety equipment; flood risk; national requirement; stakeholder consultation; bus depot; private operator; national regulation; station location; based contracts; cultural resource; working condition; biological environment; management function; physical environment; mobile application; waste reuse; media campaign; evaluation activity; consultation process; geographical zone; viable business; local traditions; vulnerable group; effective participation; engineering design; social context; national strategy; consultation activity; adverse risks; technology need; waste volume; bus driver; quality improvement; high traffic; social aspect; bus route; governing law; target indicator; social requirement; fleet size; monitoring progress; road map; social setting; strategic guidance; resource persons; civil society; electric charge; formal entity; international convention; operational plan; fiduciary responsibility; baseline conditions; response system; social environment; respiratory illness; engineering study; dump site; financial sustainability; sanitary landfill; non-governmental organization; institutional strengthening; financial operation; response measure; social media; educational material; rural transportation infrastructure; medical waste; new information; respiratory system; surrounding community; participatory approach; new technology; sanitation worker; waste transport; environmental threat; investment proposal; technology support; waste segregation; Management Systems; target beneficiary; regulatory control; monitoring equipment; emergency situation; distribution grid; pilot program; financial incentive; general awareness; environmental health; financial cost; raw material; cost-effectiveness analysis; garbage collection; monitoring data; response mechanism; gradual approach; main road
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.