Skip to Main Navigation

Vietnam - Additional Financing for Avian and Human Influenza Control and Preparedness Project (Inglês)

The objective of the Additional Financing for Avian and Human Influenza Control and Preparedness Project is to assist the recipient to increase the effectiveness of public services in reducing the health risk to poultry and to humans from avian influenza in selected provinces, through measures to control the disease at source in domestic poultry, to detect early and respond to human cases of infection, and to prepare for the medical consequences of a potential human pandemic. The additional credit will help finance the costs associated with: (a) implementation of expanded activities that consolidate and scale up the project impact under component A, Highly Pathogenic Avian Influenza (HPAI) control and eradication in the agricultural sector; and (b) scaling up of the successful pilots in strengthening human health systems in 51 additional districts in 11 provinces under component B, influenza prevention and pandemic preparedness in the health sector. There is no change to the original Project Development Objective (PDO). The results framework under the additional financing (AF) project is strengthened by adding an intermediate results indicator, namely the number of multi-sector simulation exercises conducted and reviewed at district level in the project provinces. There is no change to the project components, except that some scale up activities to address emerging zoonotic diseases are added. The project management structure at central and provincial levels will also remain unchanged. The central Project Coordination Units (PCUs) of the Ministry of Agriculture and Rural Development (MARD) and the Ministry of Health (MOH) will be responsible for the implementation of the activities in animal health sector and human health sector under the AF project respectively. The Ministry of Health will be the lead agency for implementation of the AF project, instead of the Ministry of Agriculture and Rural Development. At the provincial level, the joint Provincial Project Management Units (PPMUs) in 11 project provinces will be responsible for implementation of the AF project. Provincial Department of Health will be the lead agency for implementation of the AF project in respective provinces.

Detalhes

  • Data do documento

    2011/06/03

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    61107

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Vietnã,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2011/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Vietnam - Additional Financing for Avian and Human Influenza Control and Preparedness Project

  • Palavras-chave

    Avian and Human Influenza Control;Avian and Human Influenza Facility;Global Program for Avian Influenza;project monitoring and evaluation;Environmental and Social Safeguard;Environmental and Social Impact;outbreak of avian influenza;highly pathogenic avian influenza;national risk;Information, Education and Communication;live bird market;cases in poultry;Health Care Waste;preventive medicine;village health worker;operational risk assessment;provision of equipment;quality and efficiency;hospital infection control;fund flow arrangements;delay in procurement;laboratory surveillance;behavior change communication;local government official;pandemic preparedness plan;financial management arrangement;international quality standards;management of patients;avian influenza outbreak;disease control measure;segregation of duty;flocks of poultry;animal health worker;department of agriculture;diagnosis and treatment;animal health system;quality management program;doses of vaccine;rural loan;emerging infectious disease;simulation exercise;domestic poultry;response system;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.