Albania - Power Recovery Project (Inglês)

Detalhes

  • Data do documento

    2021/12/24

  • TIpo de documento

    Conclusão da Implementação e Relatórios sobre Resultados

  • No. do relatório

    ICR5542

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Albânia,

  • Região

    Europa e Ásia Central,

  • Data de divulgação

    2022/01/06

  • Disclosure Status

    Disclosed

  • Nome do documento

    Albania - Power Recovery Project

  • Palavras-chave

    Environmental and Social Management Framework; living standard measurement; Transmission and System Operator; Urban and Rural Development; financial internal rate of return; Economic Internal Rate of Return; project design and implementation; World Bank Group Strategy; measure of use; renewable energy law; supply and installation; data center; power sector reform; financial viability; independent power producer; power generation company; impact of weather; net present value; risk management strategy; power supply; delay in procurement; cost of import; project time frame; payment of bills; level of support; replacement of meter; reduction in network; assessment of achievement; distribution loss reduction; hydropower generation capacity; significant adverse impact; compensation for damage; resettlement action plan; power distribution company; provision of good; adverse macroeconomic effects; Private Sector Growth; risk management options; kreditanstalt fur wiederaufbau; global financial crisis; value added tax; several technical assistances; corporate income tax; power sector model; Public Financial Management; hydroelectric power plant; performance management program; distribution tariff methodology; renewable energy market; Energy Sector Reform; market performance management; variability in rainfall; Finance for Development; energy regulatory authority; earnings before interest; Power Market; reliability improvement; medium voltage; project costing; network loss; intermediate indicator; power utility; supply reliability; power utilities; road map; public power; transmission network; distribution network; load shedding; outcome targets; transmission loss; necessary training; albanian lek; data management; balancing mechanism; power network; reservoir level; fiscal deficit; other development; Indicator Baseline; short-term loan; recent years; power loss; industrial production; hydropower production; cable line; result indicator; energy strategies; market rule; electricity import; outcome indicator; electricity sale; donor coordination; tariff level; management problems; reduction measure; public company; amicable settlement; financial liquidity; weak enforcement; payment discipline; retail price; infrastructure support; power shortage; power system; fiscal support; liquidity injection; cost component; financial constraint; arbitration proceeding; hydrological condition; electricity importer; import increase; load center; meter installation; adequate electricity; Electricity Market; billing system; kv line; liquid fuel; hydropower facility; financial difficulties; illegal use; court decision; increased revenue; electricity sector; energy import; transmission system; energy bill; exchange rate; demand growth; Exchange Rates; improve risk; long-term outcome; project finance; bill collection; energy exchange; kv substation; distribution infrastructure; distribution grid; regular meetings; bilateral contract; monthly bill; financial stress; dry year; project control; international trends; fiscal problem; transmission fee; transmission utility; private power; installed capacity; commercial operation; donor support; climatic variation; generating plant; loan repayment; outreach program; electricity consumer; Advisory services; electricity distribution; energy purchase; tariff regime; payment arrears; fiscal development; extreme poverty; best practice; in poverty; annual consumption; Fiscal Sustainability; energy shortage; household expenditure; procurement delay; fiscal pressure; power exchange; supply chain; counterpart funding; coaxial cable; citizen engagement; international investment; distribution license; consumption decline; legal opinion; power meters; consumption growth; short-term liquidity; energy security; budgetary arrears; secure investment; electricity bill; travel restriction; operational efficiency; improve revenue; targeted outcomes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.