Ghana - Third Power Project (Inglês)

The Third Power Project includes the following components: (a) sub-transmission and distribution lines: about 230 circuit km of overhead and about 20 km of underground 33 kV lines; about 6 circuit km of 11 kV overhead lines with about 11 MVA of distribution transformers. About 32 km of low tension distribution lines. (b) Substations: 11 new substations with about 150 MVA of transformer capacity; expansion of about 6 existing substations with about 60 MVA of additional transformer capacity. (c) Materials and vehicles: equipment and material for rehabilitating the existing sub-transmission and distribution system; heavy, medium and light weight vehicles to replace and/or expand the existing fleet. (d) consultants services: about 105 man-months of engineering services at US$4,400 per man-month to help execute the project and two man-years of assistance to help prepare a power sector study, at an estimated cost of US$100,000.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.