Detalhes
-
Data do documento
2013/10/03
-
TIpo de documento
Documento de informações do projeto
-
No. do relatório
PIDC1218
-
Nº do volume
1
-
Total Volume(s)
1
-
País
Iêmen, República do
-
Região
-
Data de divulgação
2013/12/04
-
Disclosure Status
Disclosed
-
Nome do documento
Yemen - North-South Corridor Highway Project
-
Palavras-chave
access roads,axle load,Bridges,collaboration,Competitive Bidding,Construction,contractors,data services,decision making,Development status,engineers,exchange rates,flexibility,framework,highway projects,Highways,institution building,institutional development,learning,main roads,Operations,Pavement,Pavement Management,Pavement Management System,periodic maintenance,PMS,priorities,Project Completion,Project Implementation,public sectors,quality at entry,Rate of Return,resources development,Road Construction,Road Maintenance,Road Rehabilitation,road system,Roads,supervision,sustainability,technical assistance,traffic,traffic counting,training centers,Transport,transport projects,Urban Planning,Vehicle Operating Costs; Asphalt; Construction; Consultants; Drainage; Feeder roads; Fellowships; Flood control; Human resources development; Improvement; Institution building; Maintenance & repair; Maintenance equipment; Road & highway networks; Road & highway planning; Road surfaces; Roads & highways; Secondary roads & highways; Technical assistance; Training centers; Training needs; Training programs; Transport planning; Transport policy; Transport systems; Vocational training
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.