Detalhes
-
Autor
Bojun Huang
-
Data do documento
2021/03/28
-
TIpo de documento
Plano de Aquisições
-
No. do relatório
STEP47043
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/03/28
-
Disclosure Status
Disclosed
-
Nome do documento
China - EAST ASIA AND PACIFIC- P153115- Hunan Integrated Management of Agricultural Land Pollution Project - Procurement Plan
-
Palavras-chave
irrigation system; agriculture input; contaminated land; community participation in procurement; heavy metal; disease control equipment; disease control techniques; agricultural land; sand and gravel; Revised Plan Date; heavy metal pollution; integrated pest control; risk management options; dam safety assessment; agricultural land management; Crop; water; agricultural product; irrigation ditches; market approach; contract completion; irrigation canal; irrigation water; drainage ditch; Environmental Assessment; advance procurement; project quality; retroactive financing; project request; selection method; technical component; digital camera; environmental component; agronomic implementation; pumping station; protection equipment; technical proposal; field road; crop protection; single source; local policy; standards development; selection component; sustainable financing; soil type; project plan; laboratory instrument; projection screens; consultancy assignment; informed choice; high sea; inspection for vehicle; natural village; social evaluation; farmer training; test equipment; long-term monitoring; credit contract; straw baler
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.