Skip to Main Navigation

Vietnam - Rural Distribution Project : resettlement plan (Vol. 26) : Feasibility study : Binh Duong Province (Inglês)

The development objective of the Rural Distribution Project for Vietnam focuses on rehabilitating and increasing the capacity of existing distribution lines and substations and standardizing them to enable them to meet the growing demand more efficiently, provide better quality and quantity of electric power for productive uses, and reduce power system losses. The resettlement plan (RP) evaluated the impact on project affected peoples (PAPs). In this regard, the following mitigation measures will be applied : acquisition of land and other assets, and resettlement of people will be minimized as much as possible; all PAPs residing, working, doing business, or cultivating land in the right of way (ROW) of transmission lines, surrounding areas of tower foundations, substation areas, or service roads will be provided with rehabilitation measures to assist them to improve or at least maintain their pre-project living standards, income earning capacity, and production levels; displaced peoples (DPs) raising complaints and grievances will be treated fairly and guided by the related agencies with procedures and formalities for lodging their complaints; the previous level of community services and resources will be maintained or improved; and finally, supervision, monitoring, and evaluation of the RP implementation will be carried out effectively and timely.

Detalhes

  • Autor

    No. 1 Power Construction Consultancy Co. Ltd., PC2 Power Engineering and Consulting Center

  • Data do documento

    2007/10/01

  • TIpo de documento

    Plano de reassentamento

  • No. do relatório

    RP606

  • Nº do volume

    26

  • Total Volume(s)

    67 (Ver todos os volumes)

  • País

    Vietnã,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2008/01/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Feasibility study : Binh Duong Province

  • Palavras-chave

    land acquisition;Land Acquisition and Resettlement;productive land;residential land;resettlement and rehabilitation;income earning capacity;unit price;agricultural land acquisition;temporary access road;method of valuation;replacement cost;body in charge;poverty alleviation program;quality and quantity;resettlement of people;source of income;provincial power;compensation at replacement;source income;acquisition of land;environment management;grievance redress mechanism;award of contract;ethnic minority groups;power supply;socio-economic survey;Fixed Assets;resettlement activities;construction period;civil works;external monitoring;living standard;market price;resettlement implementation;restoration measure;industrial zone;resettlement plan;power system;productive asset;internal monitoring;rural area;household characteristic;productive use;Electric Power;distribution line;direct compensation;domestic law;grievance procedure;mitigation measure;financial resource;efficiency improvement;institutional framework;eligibility criterion;resettlement land;baseline information;public consultation;annual crop;community meetings;compensation payment;replacement value;construction stage;entitlements policy;dwelling house;resettlement sites;attending school;market economy;survey data;resettlement planning;legal framework;project impact;grievance mechanism;cash compensation;project construction;baseline data;residential purpose;Social Sciences;management oversight;ensuring compliance;modernization program;public meeting;impact survey;support policy;work shift;public road;road crossing;average distance;Public Services;monetary term;monitoring agency;proiect management;physical resources;high school;education standard;family size;financial proposal;affected population;fishery sector;employment opportunity;resettlement issue;local population;resettlement policy;information dissemination;prevailing price;land recovery;national interest;affected persons;civil law;national assembly;land management;land use;Effective Date;future demand;Resettlement projects;transaction cost;vulnerable people;land clearance;Natural Resources;legal basis;resettlement agencies;resettlement program;standard procedure;census surveys;administrative matter;qualified consultant;information campaign;compensation rate;data gathering;community asset;employment opportunities;transition period;productive capacity;Community Services;basic infrastructure;salvage material;legal right;housing condition;production level;baseline survey;effective participation;acceptable quality;aquaculture development;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.