Detalhes
-
Autor
0000A8056
-
Data do documento
2014/12/31
-
TIpo de documento
Folhas de Dados Integradas sobre Salvaguardas
-
No. do relatório
ISDSA1091
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Nome do documento
Integrated Safeguards Data Sheet (Appraisal Stage) - BR AF Teresina Enhancing Municipal Governance and Quality of Life Proj - P146870
-
Palavras-chave
Environmental and Social Management Plan;water supply and sanitation utility;degradation of critical natural habitats;Environmental and Social Impact;Environmental and Social Safeguard;management of water supply;social and economic development;basic urban service;housing for the poor;Safeguard Policies;safeguard policy;environmental management capacity;water level;detailed engineering design;Investment Project Financing;maintenance of infrastructure;management of forest;analysis of alternatives;promotion of employment;dam safety panel;violence against woman;water supply delivery;crime and violence;income generation program;adverse environmental impact;implementation of sanitation;response to crisis;significant adverse impact;natural disaster management;cost of electricity;flow rate;permanent preservation;study area;construction work;buffer zone;public consultation;environmental license;social program;Social Assessment;water quality;community association;borrower's territory;green space;environmental control;low-income population;social aspect;safeguard issue;flood event;drainage system;flood control;social study;protected area;landscape design;social studies;environmental health;urban space;environmental awareness;involuntary resettlement;resettlement process;adequate capacity;funding program;land management;road blockage;neighborhood association;continuous basis;institution building;urban design;project intervention;institutional strengthening;active participation;irreversible impacts;environmental recovery;housing improvements;beneficiary family;natural environment;economic relationship;eligible family;education service;written question;urban upgrade;Budget Management;sewerage system;financing source;international waterway;flood protection;mitigation measure;Education Services;project costing;local ngo;public awareness;canal network;environmental aspect;resettlement plan;cultural property;flood management;public space;safeguard analysis;natural conditions;Public Services;treatment system;Basic Sanitation;local legislation;sediment pollution;vulnerable area;environmental risk;wastewater collection;gender approach;planning capacity;physical characteristic;violence prevention;environmental condition;community facility;community mobilization;local resident;flood risk;citizen security;community space;River Ecosystem;safeguards data;sanitary education;promotion activity;family living;indigenous people;Indigenous Peoples;cultural tradition;cultural activities;vulnerable group;safety assessment;special care;archeological site;natural vegetation;procurement management;city service;community group;Proposed Investment;prevention capacity;organizational structure;road system;dry season;heavy load;transmission line;secondary treatment;global system;flood situation;flood condition;environmental change;pumping station;sewage pump;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.