The objectives of the Lake Qaraoun Pollution Prevention Project for Lebanon are to reduce the quantity of untreated municipal sewage discharged into the Litani River, to increase the adoption of integrated pest management practices among targeted farmers and to improve the capacity of key stakeholders to manage environmental pollution around the Qaraoun Lake. Some of the negative impacts and mitigation measures include: develop procedure for storage and handling of wastes, chemicals, and hazardous wastes; proper maintenance of machines and equipment; implement procedures to minimize dust emissions such as water spraying, covering loaded trucks; keep traffic to designated roads, position necessary diversion signs, schedule transport of workers and materials to avoid peak hours; develop procedure for storage and handling of wastes, chemicals, and hazardous wastes, maintain properly the pipelines and the pumping stations; and properly maintain the network and manage directly detected leakages and spills.
Detalhes
-
Data do documento
2015/01/29
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E4749
-
Nº do volume
1
-
Total Volume(s)
3
-
País
-
Região
-
Data de divulgação
2015/03/02
-
Disclosure Status
Disclosed
-
Nome do documento
Environmental and social management framework
-
Palavras-chave
pollution prevention;Environment and Social Management Plan;environmental and social management;pumping station;number of complaints;Environmental and Social Impact;Land Acquisition and Resettlement;construction of access road;Environmental and Social Safeguard;management of water resource;health and safety risk;construction and operation;Municipalities;source of pollution;change in procedure;movement of vehicle;public health concern;ambient noise level;public awareness campaign;national regulatory framework;maximum wind speed;document control;Solid Waste Management;treatment of wastewater;emission from vehicle;capacity building program;surface water pollution;discharge of water;sand and gravel;industrial solid waste;noise monitoring equipment;adverse environmental impact;capacity building need;Water Resource Management;categories of investments;disposal of wastewater;Environmental Management Plan;Integrated Pest Management;discharge of wastewater;implementation of mitigation;severity of impact;irrigation water quality;energy and water;capacity of farmer;ambient air quality;visual inspection;study area;public consultation;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.