Rwanda - Electricity Access Scale-up Project - Sector-wide Approach : envireonmental assessment (Vol. 3) : Environmental management plan for the construction of 110kv transmission lines from Rukarara to Kilinda (Inglês)

The objectives of the Electricity Access Scale-up Project - Sector-wide Approach (SWAp) for Rwanda are two-fold: (i) increasing electricity access to households and priority institutions at a scale consistent with the targets of the Economic Development and Poverty Reduction Strategy (EDPRS); and (ii) assisting the Government of Rwanda (GoR) mainstream the energy SWAp and process by establishing a functioning donor partnership framework for sustained financing of investment and capacity strengthening, aligned with national priorities and results. Negative measures include: impact on fauna, borrow pits, air pollution, noise pollution, aesthetics and visual related impacts, dust impacts, vegetation destruction, loss of crops in areas where access roads will be built for the project, and impacts on soil and water from machinery fuel and lubricants contamination from accidental spills or unsound disposal or handling. Mitigation measures include: a) work during approved and acceptable hours to minimize noise and effects of air pollution from their equipment; b) select borrow pits in areas not considered ecologically fragile or sensitive, rehabilitate borrow pits, and ensure that the borrow pits have drains to ensure that stagnant water which are breeding sites for disease vectors do not occur; c) effective and close supervision of construction activities; and d) locate transmission lines along pre-defined servitudes/rights of way to minimize impact on aesthetics and to maximize safety of communities near routes.

Detalhes

  • Data do documento

    2011/05/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E2070

  • Nº do volume

    3

  • Total Volume(s)

    4

  • País

    Ruanda,

  • Região

    África,

  • Data de divulgação

    2012/11/20

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental management plan for the construction of 110kv transmission lines from Rukarara to Kilinda

  • Palavras-chave

    water and sanitation authority;market for energy service;Soil and Water Conservation;security of land tenure;Energy Sector;national land policy;items in transit;national energy policy;removal of trees;private sector initiative;supply of wood;land tenure system;domestic energy demand;species of wildlife;Environmental Management Plan;electricity and gas;project affected persons;renewable energy source;lack of alternative;increase energy efficiency;average daily temperature;annual average temperature;baseline assessment;division of labour;construction and rehabilitation;soil conservation technique;probability of occurrence;adverse environmental impact;oil price crisis;affordable energy supply;establishment of regulation;Land Registration System;national policy objective;soil erosion control;standard of living;analysis of alternatives;sources of water;income generating activity;modulus of elasticity;Access to Electricity;division of labor;port of entry;safety data sheets;high energy demand;transmission line;rainy season;distribution line;international standard;rural area;cash crop;energy policies;transmission system;hazardous substance;physical environment;energy production;climatic condition;site preparation;electricity crisis;land resources;electrical equipment;dry season;topographic survey;test methods;treatment process;hydropower plant;power line;kv line;land administration;administrative framework;biological environment;electricity access;electrical distribution;land use;customary law;built drawings;food crop;cost of energy production;baseline information;distribution network;building material;mitigation measure;results framework;power cable;Hydro Power;wood fuel;external support;durability requirement;co2 emission;efficient price;iron roofs;concrete wall;treated wood;institutional framework;colonial period;fire retardant;connection targets;kerosene lamp;energy supplies;clean water;pit latrine;land policies;primary source;energy consumer;settlement pattern;corporate structure;alternative route;sensitive habitat;reference point;public consultation;environmental concern;comparative advantage;impact prediction;endangered species;attachment point;rural consumer;electrical infrastructure;national grid;drainage pattern;test pit;soil layer;surface area;mixed cropping;forest plantation;family farm;long-term framework;yield strength;mango tree;electrical lines;land transaction;lake kivu;Job Creation;prepayment meter;land development;land improvements;financial intervention;cross point;grid connection;aluminium coatings;efficient management;Solar Power;policy priority;community structure;ict infrastructure;living standard;demand growth;natural site;electricity sector;public health;solar radiation;phase transformers;secondary data;field work;safety precaution;wind velocity;specific clause;daily average;air temperature;working condition;strategic objective;traditional methods;labour intensive;intercrop system;energy planning;subsistence crop;remote area;food supply;energy activity;land fragmentation;silica gel;special arrangement;telephone line;sea water;power production;warning light;polyvinyl chloride;aluminium alloys;tensile strength;positive impact;construction phase;agricultural sector;voltage line;environmental factor;local legislation;dangerous substance;economic infrastructure;secondary sources;local resident;power shortage;donor coordination;project plan;load forecast;sweet potato;fish species;development partner;earth system;Population Growth;national economy;clearance procedure;stone fall;residential area;poor road;soil fertility;investment program;traditional walls;commercial interests;land reform;public road;land management;ground roads;market mechanism;political transformation;international level;crop plant;road access;environmental consideration;standard design;safety factor;cross road;traditional materials;Power Generation;financial incentive;Cash Income;eucalyptus tree;important component;vegetation cover

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.