Skip to Main Navigation

Turkey - Igdir - Aksu - Eregli - Ercis (IAEE) Irrigation Project (Inglês)

The Igdir-Aksu-Eregli-Ercis (IAEE) Irrigation Project supports the Government's efforts to accelerate completion of priority irrigation schemes. Four subprojects have been selected: Igdir, Aksu, Eregli and Ercis (IAEE) and for each the project will assist in financing: (i) completion of irrigation and drainage infrastructure; (ii) on-farm development works; (iii) strengthening of the extension system; (iv) operation and maintenance equipment; and (v) staff training. The project will also include preparation of an irrigation investment master plan and strategy review.

Detalhes

  • Data do documento

    1983/05/31

  • TIpo de documento

    Relatório sobre Avaliação do Pessoal

  • No. do relatório

    4299

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Türkiye,

  • Região

    Europa e Ásia Central,

  • Data de divulgação

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Turkey - Igdir - Aksu - Eregli - Ercis (IAEE) Irrigation Project

  • Palavras-chave

    fresh fruit and vegetable;Economic Rate of Retum;structural adjustment loan;irrigation;crop and livestock;public sector investment;irrigated area;vegetable and fruit;corn for silage;water resource development;marketing of fruit;public investment budgeting;average farm size;high water table;parcel of land;cost of irrigation;fields of specialization;calcareous parent material;Supply of Water;provision of service;annual average precipitation;sales tax revenue;increases in output;weights and measure;subject matter;Accounts and Audit;cost of capital;water distribution system;rate of growth;surface water source;efficient land use;provision of credit;level of private;foreign trade regime;milk processing plant;access to import;point of entry;annual average rainfall;irrigation and drainage;extension service;irrigation scheme;agricultural sector;irrigation development;Irrigated Agriculture;field crop;irrigation network;farming system;sunk cost;horticultural crop;irrigation works;irrigation water;small area;diversion dam;extension personnel;land levelling;agricultural production;investment program;irrigation sub-sector;cotton seed;asphalt road;investment planning;radio service;farmers uses;Exchange Rates;export performance;irrigation investment;agricultural sale;export growth;provincial road;main canals;marketing opportunities;cropping intensity;capital expenditure;flat land;cropping pattern;textile mill;earth road;Land tenure;financial analysis;private investment;drainage problem;extension activity;irrigation infrastructure;paved road;agricultural technician;temperature range;farming operation;land area;rainfall distribution;irrigation construction;heavy soil;incremental expenditure;construction supervision;salinity problem;private contractor;river bed;economic crisis;land holding;sugar factory;radio program;farm production;extension specialist;mediterranean region;truck capacity;extension program;relative humidity;heavy rainfall;conservation problem;coastal area;building material;production level;continental climate;Food Silo;summer months;increased supply;crop land;soil reclamation;sugar beet;water buffalo;peak demand;river water;family labor;flood control;marginal increase;portfolio review;processing capacity;edible oil;wheat production;flour mill;wheat flour;local poultry;project selection;economic stabilization;investment programming;capital assistance;irrigation area;budgetary allocation;flood plain;flat plain;sea level;single crop;private trader;winter wheat;central market;small family;regional output;steel frame;export targets;financial aggregate;public expenditure;sectoral priority;smaller one;summary list;oil processing;national output;future investment;shallow wells;sloping land;storage water;dry season;water right;evaluation capability;project identification;foreign market;small stream;budget requirement;private construction;grazing right;mixed farming;grazing cattle;temperature maximum;clay content;crop yield;irrigation system;tertiary canal;surface drainage;lift pump;fodder crop;flood protection;flood area;medium-term program;storage facility;cold storage;drainage water;upstream area;improved seed;irrigator association;bank finance;export earnings;economic reform;small Works;farm development;legal provision;technological change;crop production;government expenditure;crop area;irrigable land;industrial crop;cold winter;price system;water availability;chemical input;repayment period;land improvements;appraisal mission;grace period;topographic survey;raw material;foreign earnings;food supply;urban work;agricultural commodity;production increase;agricultural mechanization;groundwater source;financial subsidy;producer price;investment performance;storage dam;turkish lira;legal procedure;capital recovery;irrigation season;irrigators association;agricultural value;monetary expansion;dry summers;demand management;large reservoir;farm level;draft legislation;capital formation;technology generation;factor productivity

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.