The project would review and establish capacity and production levels of ZCCM which -- for the short-, medium- and long-term -- can be justified from an economic, financial and market point of view. It would assist ZCCM to adopt a management and investment strategy in line with such production and capacity targets. The project represents the first phase of ZCCM's 5-year rehabilitation and modernization program and consists of three major components: (a) replacement and rehabilitation of high-priority equipment and spares for existing mine and plant facilities; (b) training to upgrade the skills of technical and supervisory personnel; and (c) technical studies to rationalize ZCCM's operations. The Project would be implemented by ZCCM. The Project would increase the efficiency and profitability of the mining industry and support Zambia's strategy of economic diversification. It would also improve Zambia's balance of payments by supporting foreign exchange earnings through mineral exports and would provide additional revenues to the Government through mineral and other taxes.
Detalhes
-
Data do documento
1984/02/29
-
TIpo de documento
Memorando e recomendação do Presidente
-
No. do relatório
P3664
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/24
-
Disclosure Status
Disclosed
-
Nome do documento
Zambia - Export Rehabilitation and Diversification Project
-
Palavras-chave
Metallurgical machinery; Management development; Concentrators (communications); Mining machinery; Mining equipment; Mining technology; On the job training; Technical training
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.