Detalhes
-
Data do documento
2009/12/14
-
TIpo de documento
Documento de informações do projeto
-
No. do relatório
52723
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Disclosure Status
Disclosed
-
Nome do documento
Paraguay - Energy Sector Strengthening Project
-
Palavras-chave
transmission line;Electricity;loss reduction;electricity sector;millennium development goal;high population growth rate;Economic and Social Plan;quality of service standard;physical cultural resources;hydroelectric power plant;transmission and distribution;strategy formulation;deterioration of infrastructure;electricity demand growth;power generation capacity;agriculture and livestock;electricity transmission network;due diligence procedure;social and environmental;acquisition of equipment;investments in power;Energy;efficient management;kv substation;installed capacity;bank involvement;transmission system;transmission capacity;power utility;peak demand;power utilities;distribution management;marginal areas;sound energy;rural population;electricity tariff;electricity service;regulatory entity;electricity export;monitoring mechanism;energy planning;distribution investment;extreme poverty;distribution activity;commercial performance;informal sector;energy policies;supply capacity;power supply;financial value;production capacity;energy specialist;financing source;goods export;domestic consumption;purchasing agreement;thermal plant;electricity security;contractual arrangement;performance result;hydroelectric resource;Economic Policy;private consumption;vulnerable group;public nature;financial crisis;improving governance;modern economy;Energy Sector;Electricity Market;hydroelectric plant;institutional framework;government power;institutional strengthening;integrated management;total consumption;reliability standards;transmission investment;natural habitat;weighted average;metropolitan area;heavy rain;financial challenge;transmission bottleneck;domestic demand;indigenous people;Indigenous Peoples;involuntary resettlement;planning capacity;program development;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.