The proposed loan would cover part of the foreign exchange costs of a project to construct the second stages of the Prai and the Port Dickson Thermal Stations and associated transmission facilities.
Detalhes
-
Data do documento
1968/12/31
-
TIpo de documento
Relatório sobre Avaliação do Pessoal
-
No. do relatório
TO697
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Malaysia - Fourth Power Project
-
Palavras-chave
allocation of capital cost;interest during construction;fixed asset;Fixed Assets;installed capacity;internal cash generation;thermal plant;generating plant;hydro plant;expansion of transmission;electric power sector;number of water;degree of autonomy;capital development;increase in labor;long-term debt;dry season;Invitation for Tenders;foreign exchange;gross national product;load center;thermal plant capacity;cost of energy;demand for power;evaluation of bid;amount of water;generating capacity;firm capacity;transmission line;bilateral sources;hydroelectric plant;hydroelectric scheme;mountain range;tin mine;civil works;plant operator;foreign costs;down payment;transmission system;capital expenditure;tariff structure;cooling water;overdraft facility;bank finance;construction schedule;transmission facility;construction expenditures;public expenditure;grace period;capital structure;international tender;present cost;appraisal mission;climatic condition;price decline;financing terms;cash position;Bank Fund;annual investment;production cost;financial requirement;cash surplus;debt service;relative value;slight reduction;loan fund;construction work;external investment;peak demand;industrial facility;load curve;base load;load forecast;power shortage;industrial zone;tin price;rubber prices;economic slowdown;pessimistic forecast;agricultural product;palm oil;demand forecast;maintenance expenses;local costs;minimum level;earned surplus;accounting method;gross revenue;tariff change;accumulated depreciation;internal resources;total debt;manhattan bank;information supply;loan amounting;credit source;capital requirement;Financing plans;business community;unskilled worker;professional engineer;supervisory staff;professional training;short period;electricity tariff;boiler design;fuel cost;income statement;long-term finance;excessive use;tin industry;manufacturing industry;export price;bank assistance;Hydroelectric Power;abundant rainfall;statutory authority;coastal area;hydroelectric site;Power Market;flood control;hydroelectric development;electrical energy;submarine cable;project financing;transmission expansion;future earnings;maximum demand;kilowatt hour;gigawatt hour;electricity system;special provision;long-term contract;route mile;storage capacity;generation plant;supplementary financing;prevailing price;construction supervision;
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.