Detalhes
-
Autor
JacquesBure
-
Data do documento
2017/06/06
-
TIpo de documento
Folhas de Dados Integradas sobre Salvaguardas
-
No. do relatório
ISDSR21375
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2017/06/06
-
Disclosure Status
Disclosed
-
Nome do documento
Integrated Safeguards Data Sheet (Restructuring Stage) - SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) - P099270
-
Palavras-chave
road section;Economic Internal Rate of Return;monitoring and evaluation system;Environmental and Social Impact Assessment;international transit;average annual daily traffic;Environmental and Social Safeguard;Land Acquisition and Resettlement;project design and implementation;Occupational health and safety;mitigation measure;Safeguard Policies;safeguard policy;net present value;flora and fauna;civil works;efficient vehicle operation;pattern of river;ground water resource;adverse social impact;negative environmental impact;impacts on landscape;impact of emissions;land plot;construction work;discount rate;natural habitat;commercial land;local population;labor camp;labor influx;agricultural land;cultural significance;river bed;cultural property;construction camp;conservation value;private land;sensitivity analysis;public consultation;land use;axle load;indirect impact;road work;public feedback;bearing capacity;environmental safeguard;economic sector;environmental control;private road;primary beneficiaries;pavement design;monitoring indicator;longer period;burial site;driving condition;resettlement impacts;historic site;grievance management;regular monitoring;adjustment need;local beneficiary;construction site;road quality;resettlement plan;public place;local ngo;institutional responsibilities;environmental specialist;religious group;social relation;construction phase;road condition;road operator;project finance;hydrological regime;indigenous people;road upgrade;draft form;ancillary activities;traffic diversion;grazing land;affected persons;pasture land;national legislation;cash compensation;replacement value;dam safety;international waterway;Indigenous Peoples;safeguard issue;irreversible impacts;baseline data;irrigated farming;Animal Husbandry;climatic condition;aggregate material;parking area;building material;compensation payment;road expansion;construction management;forestry activities;cultural site;financing source;economic model;capital work;road alignment;exit road;cold winter;short period;natural hazard;seasonal variability;flood potential;road corridor;safeguards data;counterpart funding;transport efficiency;road management;Traffic Safety;road safety;road maintenance;road standard;road structure;drainage system;relevant element;tree plantation;construction activities;contract - requirements;contract requirement;buffer zone;precautionary measure;historic monuments;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.