China - Fourth Inland Waterways Project : resettlement action plan (Vol. 4) : Anhui Highway Project II (Inglês)

The Naji Navigation Complex Project is composed of two sub-projects. Sub-project (A) the Naji Navigation Complex is composed mainly of dam, shiplock, powerhouse of the hydropower plant, step-up switchyard, power interconnection and auxiliary facilities. Sub-project (B) Navigation Channel Harnessing includes two parts, (a) navigation channel in reservoir area, and (b) navigation channel from Naji to Nanning. Due to the backwater or reservoir, the project impacts only one household for relocation. The house will be compensated at replacement price. In order to be convenient for daily life and minimize the influence to production and economic income of resettlers, the selected house source should be as near as possible to the original community. The resettlers can select to purchase a commercial house or to build a new one. The resettlers should be given notice at least three months before moving. During the implementation period, the resettlement organization should take effective measures to help the family with special needs. The compensation fee, and housing should be paid to resettlers at one time or by stages before the signing of the contract of procurement of the commercial house or before the completion of the house. If the payment of compensation is distributed by stages, the final payment should be settled up before the validity of the contract, or before the completion of the house.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.