Detalhes
-
Autor
Chongjie Li
-
Data do documento
2021/06/29
-
TIpo de documento
Plano de Aquisições
-
No. do relatório
STEP51208
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/06/29
-
Disclosure Status
Disclosed
-
Nome do documento
China - EAST ASIA AND PACIFIC- P132621- Yunnan Highway Asset Management Project - Procurement Plan
-
Palavras-chave
asphalt pavement; asset management system; emergency response vehicle; monitoring equipment; market approach; chip seal; emergency response system; public information system; Revised Plan Date; power supply system; system improvement; road management system; public information service; contract completion; asset valuation; pavement rehabilitation; inspection for vehicle; recycling equipment; preventive maintenance; highway maintenance; bridge inspection; lease fee; tunnel maintenance; credit contract; information display; equipment installation; test equipment; milling machine; prior asset; valuation guidelines; data center; contract management; construction cost; road asset; road improvement; Exchange Rates; emergency maintenance; social safeguard; information function; external environment; storage tank; consulting service; high sea; Consulting services; maintenance manual; highway research; highway performance; test testing; private network; network system; safety study; construction supervision; power system; data sharing; security system; wire system; toll gate; computer server; backup storage; technical proposal; software procurement; asset accounting; fiber optic; improving performance; maintenance vehicles; assessment system; long tunnel
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.