This is an environmental management plan for the Second Southern Provincial Rural Electrification (Phase 1) Project, which builds transmission lines for rural electrification. It assesses potentially negative environmental impacts and proposes measures to mitigate them. Although major impacts are not expected, these are among the risks to be mitigated: Avoid unneeded tree cutting by clearly marking paths and trees to be cut. Reduce noise by doing construction during daytime only and securing the village approval before night scheduling. Routinely monitor health of workers and provide them with safety gear to minimize injury and illness. Install danger warning signs to protect communities. Avoid burning trees near the power lines. Prevent transformer leaks that may contaminate water courses by regular inspections and cleaning and disposing of any spilled insulating/cooling oils.
Detalhes
-
Autor
Electricite du Lao
-
Data do documento
2005/01/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E995
-
Nº do volume
23
-
Total Volume(s)
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Nome do documento
Subproject in Soukhouma District, Champasack Province
-
Palavras-chave
kv transmission line;worker health and safety;consultation meeting;Electricite du Laos;kv line;monitoring plan;village head;power line;monitoring equipment;independent worker;noise pollution;water course;safety plan;medium voltage;monitoring frequency;Electricity;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.