Skip to Main Navigation

China - Third National Railways Project : resettlement plan (Vol. 2) : Summary of resettlement action plan : additional second line - Zhanyi - Liupanshui railway (Inglês)

The objective of the Third National Railways Project is to significantly improve the effectiveness of railway system operations in Guizhou and Yunnan Provinces, through the realignment and double-tracking of the last section of the electric Shanghai-Kunming line, seeking to eliminate railway traffic bottlenecks. An additional second line - Zhanyi-Liupanshui - section will require earthworks for the embankment, including masonry works, and a considerable ratio of bridges and tunnels. These works will certainly entail land requisition, and the relocation of a considerable number of project affected people (PAP), as well as enterprises and private businesses. In order to safeguard the rights, and livelihoods of all peoples, including ethnic minorities and the most vulnerable, this resettlement plan (RAP) sets the compensation standards as follows. Compensation for loss of cultivated land shall be calculated by the output value of vegetable land (1150 Yuan/Mu), while the output value of dry land calculated according to 716 Yuan.Mu; compensation for land requisition will be calculated at 10 times its output value; allowance for resettlement will be compensated at 15 times of the land output value; and, compensation for crops calculated at 1 time the annual output value. The compensation standard for relocation in urban areas shall be determined according to current, real estate market value assessments. Grievance mechanisms will be in place should any conflict occur.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.