Detalhes
-
Autor
Alberto Leal
-
Data do documento
2021/07/28
-
TIpo de documento
Plano de Aquisições
-
No. do relatório
STEP52321
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/07/28
-
Disclosure Status
Disclosed
-
Nome do documento
Sao Tome and Principe - AFRICA EAST- P157096- STP Power Sector Recovery Project - Procurement Plan
-
Palavras-chave
Electricity; environmental impact study; financial procedures manual; audit support; Revised Plan Date; applicable procurement method; market approach; contract completion; retroactive financing; access road; power meters; least cost; advance procurement; Energy Sector; topographic survey; network protection; selection method; first contract; credit contract; energy generation; high sea; environmental safeguard; hydropower plant; operational alternative; civil works; load distribution; water channels; transmission line; legal opinion; PPP Strategy; project effectiveness; surface mapping; energy production; management improvement; operational quality; communication strategy; procurement manual; procurement arrangement; project plan; prior review; cost of energy production; technical proposal; single source; consultancy assignment
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.