Detalhes
-
Data do documento
2010/03/04
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR13185
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/25
-
Disclosure Status
Disclosed
-
Nome do documento
Georgia - Energy Transit Institution Building Project
-
Palavras-chave
Environmental and Social Impact Assessment;Oil and Gas;Oil & Gas;Oil and Gas Sector;oil and gas company;Project Preparation and Appraisal;oil and gas pipeline;social and environmental;international accounting standard;international standard;history of conflict;International Auditing Standards;quality of supervision;lack of ownership;Law and Justice;level of readiness;absence of consent;quality at entry;construction and operation;consultancy service;spill response;Advisory services;Armed Conflict;operational decisions;monitoring equipment;gas flow;insufficient information;pipeline construction;legal advice;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.