Skip to Main Navigation

Myanmar - Electric Power Project : restructuring (Inglês)

The development objective of the Electric Power Project for Myanmar is to increase the capacity and efficiency of gas-fired power generation in Myanmar and strengthen the institutional capacity of relevant agencies. The restructuring is required to reflect a change in safeguard policies triggered by the project, to extend the closing date, and to update the results framework.

Detalhes

  • Data do documento

    2017/12/01

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    RES29098

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Mianmar,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2017/12/26

  • Disclosure Status

    Disclosed

  • Nome do documento

    Myanmar - Electric Power Project : restructuring

  • Palavras-chave

    Environmental and Social Safeguard;economic and financial analysis;grievance redress mechanism;Environmental Management Plan;transmission and distribution network;fuel saving;generation capacity;supply and installation;water supply infrastructure;Corporate Results Indicator;results framework;Energy;cycle gas turbine;area of regulation;natural gas supply;Special Drawing Right;gas-fired power plant;power generation capacity;exchange rate fluctuation;delay in procurement;Advisory services;citizen engagement;result indicator;installed capacity;safeguard specialist;land use;road work;feedback mechanism;thermal efficiency;public consultation;national electrification;grid electricity;physical resettlement;efficiency improvement;energy shortage;safety management;rainy season;calorific value;compensation requirement;energy conversion;community meetings;baseline scenario;grievance redressal;financing agreement;affected persons;safety measure;formal communication;plant equipment;environmental analysis;conversion efficiency;ecological value;safeguard policy;procurement activities;consulting service;Consulting services;conservative assumption;procurement performance;satisfactory progress;internal approval;procurement staff;short period;electricity transmission;power station;Safeguard Policies;financial viability;audit requirements;ongoing support;procurement delay;annual target;turbine operation;Indicator Target;electricity distribution;intermediate indicator;project intervention;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.