The development objective of the Electric Power Project for Myanmar is to increase the capacity and efficiency of gas-fired power generation in Myanmar and strengthen the institutional capacity of relevant agencies. The restructuring is required to reflect a change in safeguard policies triggered by the project, to extend the closing date, and to update the results framework.
Detalhes
-
Data do documento
2017/12/01
-
TIpo de documento
Documento do projeto
-
No. do relatório
RES29098
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2017/12/26
-
Disclosure Status
Disclosed
-
Nome do documento
Myanmar - Electric Power Project : restructuring
-
Palavras-chave
Environmental and Social Safeguard;economic and financial analysis;grievance redress mechanism;Environmental Management Plan;transmission and distribution network;fuel saving;generation capacity;supply and installation;water supply infrastructure;Corporate Results Indicator;results framework;Energy;cycle gas turbine;area of regulation;natural gas supply;Special Drawing Right;gas-fired power plant;power generation capacity;exchange rate fluctuation;delay in procurement;Advisory services;citizen engagement;result indicator;installed capacity;safeguard specialist;land use;road work;feedback mechanism;thermal efficiency;public consultation;national electrification;grid electricity;physical resettlement;efficiency improvement;energy shortage;safety management;rainy season;calorific value;compensation requirement;energy conversion;community meetings;baseline scenario;grievance redressal;financing agreement;affected persons;safety measure;formal communication;plant equipment;environmental analysis;conversion efficiency;ecological value;safeguard policy;procurement activities;consulting service;Consulting services;conservative assumption;procurement performance;satisfactory progress;internal approval;procurement staff;short period;electricity transmission;power station;Safeguard Policies;financial viability;audit requirements;ongoing support;procurement delay;annual target;turbine operation;Indicator Target;electricity distribution;intermediate indicator;project intervention;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.