The Bank established a specific policy and procedures for environmental assessment and related environmental analyses of International Bank for Reconstruction and Development (IBRD) lending operations. Under this environmental assessment process, the type, timing, and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Banks prospective lending program and thereafter reported and updated on a quarterly basis in the monthly operational summary. This report focuses on the monthly operational summary of Bank as of December 1971.
Detalhes
-
Data do documento
1971/12/20
-
TIpo de documento
Resumo de Desembolsos Mensais
-
No. do relatório
146274
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/06/06
-
Disclosure Status
Disclosed
-
Nome do documento
Monthly Operational Summary of Bank and IDA Proposed Projects (as of December 14, 1971)
-
Palavras-chave
mission in field; qualifications for bidders; qualification of bidder; invitation to bid; water treatment plant; approval of loan; letter of intent; water and sewerage; fishing port; call for bids; prequalification of bidders; retroactive financing; appraisal mission; finance company; joint financing; preparation mission; parallel financing; Power Generation; civil works; procurement issue; highway maintenance; project identification; power transmission; government decision; Oil Pipeline; government action; family farming; steel mill; oil palm; government approval; management cost; urban study; road maintenance; logging concessions; grain storage; reservoir area; foreign exchange; Loan schedule; tourism consultants; port charge; technical appraisal; flood control; highway planning; seed production; Industrial Estate; urban transport; marine transport; development mission; railway electrification; government's view; Consulting services; road section; feasibility stud; transmission line; phosphoric acid; tree crop; company financing; project plan; coffee processing; educational system; financing plan; Financing plans; credit proceeds; financial plan; land settlement; city water; african unity; project selection; Gas Turbine; government consultants; engineering service; port expansion; steel plant
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.