Detalhes
-
Autor
-
Data do documento
2013/04/28
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR10070
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Nome do documento
Africa - WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) : P075994 - Implementation Status Results Report : Sequence 14
-
Palavras-chave
coastal state;power utility;power utilities;power exchange;Loan to Turkey;adaptable program loan;power supply;cross-border electricity trade;kv transmission line;power transfer;peak power;vulnerability to drought;quantity of electricity;cash compensation;loan proceeds;financial agreement;response time;equipment installation;transmission network;power system;credit closing;load shedding;result indicator;interconnection link;power outage;power loss;results framework;intermediate indicator;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.