Africa - WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) : P075994 - Implementation Status Results Report : Sequence 14 (Inglês)

Detalhes

  • Autor

    Mathrani,Sunil W.

  • Data do documento

    2013/04/28

  • TIpo de documento

    Situação da implementação e relatório dos resultados

  • No. do relatório

    ISR10070

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    África,

  • Região

    África,

  • Nome do documento

    Africa - WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) : P075994 - Implementation Status Results Report : Sequence 14

  • Palavras-chave

    coastal state;power utility;power utilities;power exchange;Loan to Turkey;adaptable program loan;power supply;cross-border electricity trade;kv transmission line;power transfer;peak power;vulnerability to drought;quantity of electricity;cash compensation;loan proceeds;financial agreement;response time;equipment installation;transmission network;power system;credit closing;load shedding;result indicator;interconnection link;power outage;power loss;results framework;intermediate indicator;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.