Skip to Main Navigation

Indonesia - Third Fertilizer Expansion (PUSRI IV) Project (Inglês)

The detailed engineering, construction and startup of a fertilizer plant at Palembang, Sumatera, to manufacture about 1,000 TPD (tons per day) of ammonia and 1,725 TPD of urea; training of PUSRI's staff and staff employed in the national fertilizer industry in Indonesia in the operation and maintenance of plant, as well as in financial and accounting procedures. The plant's facilities would include: (1) a single-train ammonia unit with a capacity of about 1,000 metric tons per day; (2) a single-train urea unit with a capacity of about 1,725 metric tons per day; (3) a natural gas pre-treatment section; (4) the usual off-sites and auxiliaries required to support such a plant, including an ammonia storage tank, urea storage and loading facilities, cooling towers, water treatment facilities, a 15 MW gas turbine power generator,a bag making plant and expansion of the existing jetty. The Fourth PUSRI - Third Fertilizer Project is part of a larger program which will also include the development of a gas gathering and distribution system and a fertilizer distribution facility.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.