Skip to Main Navigation

Vietnam - Additional financing for Second Rural Energy Project : resettlement plan (Vol. 2) : Resettlement plan (annexes) for Thanh Hoa province (Inglês)

The objective of the Second Rural Energy Project are to assist the Government of Vietnam to alleviate poverty in the rural areas by providing basic infrastructure service such as electricity and access to general services, for improving living conditions and productivity. Some of the negative impacts of the project and their mitigation measures are: 1) acquisition of land and other assets, and resettlement of people will be minimized as much as possible; 2) all Displaced Persons (DP's) residing, working, doing business or cultivating land in right of way (ROW) of transmission line (TIL), surrounding areas of tower foundation, the substation areas, in the service road under the date of the baseline surveys are entitled to be provide with rehabilitation measures sufficient to assist them to improve or at least maintain their pre-project living standards, income earning capacity and production levels; 3) the rehabilitation measures to be provided are: (i) compensation at replacement cost, without deduction for depreciation or salvage materials for house and other structures; (ii) agricultural land for land of equal productive capacity acceptable to the DPs or in cash at replacement cost according to DP's choice; (iii) replacement of residential/premise land of equal size acceptable to DP or in cash at replacement cost according to DP's choice; and (iv) transfer and subsistence allowances; 4) replacement residential and agricultural land will be as nearby as possible to the land that was lost, and acceptable to the DPs; 5) plans for acquisition of land and other assets and provision of rehabilitation measures will be carried out in consultation with the DP's, to ensure minimal disturbance. Entitlements will be provided by DP's prior to expected star-up of works at the respective project site; 6) the previous level of community services and resources will be maintained or improved; 7) financial and physical resources for resettlement and rehabilitation will be made available and as where and when required; and 8) effective and timely supervision, monitoring, and evaluation of the implementation of Resettlement Plans (RPs) will be carried out.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.