Detalhes
-
Data do documento
2004/02/13
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR11664
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/25
-
Disclosure Status
Disclosed
-
Nome do documento
Niger - Urban Infrastructure Rehabilitation Project
-
Palavras-chave
french development;Municipalities;amount of loan;local training institution;water supply system;impact on poverty;poverty analysis tools;local engineering;municipal decentralization;infrastructure asset;grant financing;construction industry;safeguard policy;Safeguard Policies;institutional environment;counterpart fund;funding mechanism;effective strategy;adequate training;work order;budgetary resource;Environmental Assessment;local contractor;temporary employment;municipal management;satisfactory manner;Urban Infrastructure;International Trade;Urban Planning;infrastructure program;indirect impact;Public Facilities;engineering study;beneficiary population;health facility;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.