Detalhes
-
Autor
-
Data do documento
2017/04/16
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR27473
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2017/04/16
-
Disclosure Status
Disclosed
-
Nome do documento
China - Anhui Yellow Mountain New Countryside Demonstration Project : P129563 - Implementation Status Results Report : Sequence 08
-
Palavras-chave
wastewater treatment and disposal;income generating opportunity;access to irrigation;quality water supply;water supply pipeline;capacity for implementation;length of road;irrigation and drainage;improved water source;performance evaluation system;cultural heritage conservation;Investment Project Financing;infrastructure service;tourism services;intermediate outcome;agriculture technology;rural resident;tourism facilities;result indicator;flood control;historic building;traditional art;production base;unit train;intermediate indicator;improved sanitation;operation risk;risk category;land area;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.