Skip to Main Navigation

Argentina - Second Norte Grande Water Infrastructure Project : inspection panel report and recommendation on a request for inspection (Inglês)

On May 4, 2011, the inspection panel received a request for inspection from the Comunidad Los Flores. The request was submitted on behalf of residents of neighborhoods in the city of Santiago del Estero, Argentina. The request received by the panel on May 4, 2011 was complemented by a clarifying note received on May 15, which the requesters asked that the panel consider as an integral part of the request. The requesters asked that the panel keep their names as confidential. The requesters raise concerns related to the Argentina: Second Norte Grande Water Infrastructure Project ('SNGWIP' or the 'Project') and more specifically about one of the subprojects expected to be financed under the project in the city of Santiago del Estero, where the requesters reside.

Detalhes

  • Data do documento

    2011/08/26

  • TIpo de documento

    Relatório e recomendação do Painel de Inspeção

  • No. do relatório

    64338

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Argentina,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2011/09/20

  • Disclosure Status

    Disclosed

  • Nome do documento

    Argentina - Second Norte Grande Water Infrastructure Project : inspection panel report and recommendation on a request for inspection

  • Palavras-chave

    water supply and sanitation service;conflict resolution system;land use and management;wastewater treatment plant;availability of water;prima facie evidence;social communication;participation of communities;access to sanitation;long term development;disposal of sludge;contamination of water;transfer of fund;social and environmental;exchange of information;local water body;determination of eligibility;construction and operation;flow of fund;public consultation;sewage works;public hearing;drainage canal;eligibility criterion;web page;institutional framework;citizen participation;cumulative impact;focus group;consultation process;wastewater system;institutional responsibilities;subject matter;Indigenous Peoples;social aspect;federal court;consultation requirement;wastewater management;living condition;potential investment;enforcement authority;safeguard policy;Safeguard Policies;affected communities;involuntary resettlement;sewerage system;environmental conservation;indigenous affair;positive impact;adequate mitigation;outreach effort;social legislation;standard procedure;indigenous representative;environmental oversight;Social Assessment;conflict regard;urban growth;social impact;unsanitary condition;summer months;sewerage connection;air channel;court procedure;hospital waste;raw effluents;project impact;management improvement;investment need;social inclusion;sanitation work;safeguard issue;social participation;coverage rate;Natural Resources;exchange information;capacity constraint;specific issue;River basin;social standard;local legislation;provincial authority;sanitation situation;student support;sewerage works;environmental study;documentary evidence;mitigation measure;sewage network;water infrastructure;urban drainage;environmental authority;stakeholder consultation;legal case;disposal facility;regional planning;institutional strengthening;drainage channel;diverse population;capacity assessment;indigenous community;sewerage treatment;indigenous communities;subproject proposal;institutional stakeholders;environmental agency;water resource;Environmental Assessment;wastewater discharge;energy requirement;population mobility;illegal connection;sewage discharge;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.