Africa's first bus rapid transit scheme : the Lagos BRT-Lite system (Inglês)

Africa's first bus rapid transit (BRT) scheme began operations on March 17, 2008, in Lagos, Nigeria. Called 'BRT-Lite', it is a form of the BRT system, but it is not of the highest specification like the TransMilenio in Bogota or the Brisbane South East Busway, both of which cost about $6 million per kilometer. This new form of the BRT scheme is aimed at delivering a transport system that will meet the needs of local users, while improving citizens'...