India - Jharkhand Municipal Development Project : environmental assessment : Environmental and social impact assessment and management plan for Khunti Water Supply Project (Inglês)

The development objective of the Jharkhand Municipal Development Project for India is to improve urban service delivery and urban management capacity in participating urban local bodies (ULBs). Some of the negative impacts and mitigation measures include: (i)prepare a detailed planning and construction phasing schedule, and coordinate service interruption with public utilities and public administrations. (ii) no trees will be cut or damaged within the forest area as per the conditions of the NOC; (iii) removal of vegetation (bushes) will be limited to the extent possible within the urban area; (iv) prior information and consultation with hospitals, schools, institutions and local authorities wherever any sensitive receptor is concerned, such that access should not be disturbed or affected; (v) transport vehicles and equipment will undergo regular maintenance to avoid any oil leakages; (vi) wastewater generated from the washing or cleaning area in camp site, after passing through oil and grease trap and curing area can be re-used for water sprinkling and wheel washing; (vii) proper cover and stacking of loose construction material and excavated loose soil will be ensured to prevent surface runoff and contamination of receiving water bodies; (viii) fugitive dust emissions will be suppressed by spraying water and wetting of the stockpiles; (ix) only well-maintained equipment will be operated on-site, and, regular maintenance of equipment such as lubricating moving parts, tightening loose parts and replacing worn out components will be conducted; (x) safety conditions in the trenches during construction phase shall be ensured using appropriate shoring systems and dewatering mechanisms; (xi) vaccinating workers against common and locally prevalent diseases; and establishment of health centres at camp and construction site for routine health screening.

Detalhes

  • Data do documento

    2017/11/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    SFG3865

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Índia,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2017/12/08

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental and social impact assessment and management plan for Khunti Water Supply Project

  • Palavras-chave

    Environment and Social Management Plan;Environmental and Social Management Plan;Environmental and Social Impact Assessment;ambient air quality monitoring;road right of way;health and safety officer;Occupational health and safety;Environmental and Social Safeguard;bonded labour system;sexual harassment of woman;implementation of water supply;quantity of water;analysis of alternatives;water supply scheme;loss of income;total water;social and environmental;disposal of sludge;civil society organisation;personal protective equipment;access to information;water quality monitoring;environmental quality monitoring;ambient air temperature;surface water supply;urban management capacity;water supply system;Environmental Management Plan;urban service delivery;resettlement action plan;land use pattern;noise monitoring location;replacement of pipeline;environment impact assessment;requirements of banks;physical cultural resources;participation of woman;domestic water supply;municipal landfill site;clear water transmission;number of women;wastage of water;construction and rehabilitation;expansion of coverage;number of connections;improved water quality;urban infrastructure development;water supply point;reduction in groundwater;improved living standard;water supply infrastructure;construction and operation;potable water supply;planning and design;flora and fauna;piped water supply;women headed household;operations and maintenance;amount of water;loss of property;water treatment process;raw water;rising main;construction phase;grievance redressal;mitigation measure;pumping machinery;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.