The purpose of the Liaoning Third Medium Cities Infrastructure Project is to strengthen the infrastructure construction, improve the quality of heating, solve the problem of regional environmental pollution and increase the living standard of the population. The project includes infrastructure projects of 6 cities such as Anshan, Fushun, Benxi, Liaoyang, Yingkou and Huludao, and 10 sub-projects after the primary discussions and screenings. Key environmental impacts resulting from the project include noise, dust, and waste water during the construction phase of the heat supply plant. During the operational phase, dust, smoke, sulfur dioxide, ash and noise etc from hot water boilers will have a negative impact. In the construction stage of the pipeline network/ heat exchange station project, key environmental issues will be noise from heat exchange station construction, dust, waste water, domestic and building wastes; noise, dust and traffic interruptions resulting from pipeline network construction. In the operating period of this project there will be noise from heat exchange station. During the construction phase of the gas supply project, key environmental issues will be construction noise of gas supply factory, dust, building waste water, domestic and building wastes; noise, dust and traffic interruptions resulted from pipeline network construction, while in the operating period negative impacts include pollutants emitted from boilers of gas supply plant, waste water and noise. It is hoped that when this project is put into use, ambient air quality in all regions will be improved and the rate of respiratory diseases will be reduced significantly.
Detalhes
-
Autor
Liaoning Academy of Environmental Sciences
-
Data do documento
2007/07/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E1714
-
Nº do volume
10
-
Total Volume(s)
-
País
-
Região
-
Data de divulgação
2007/12/18
-
Disclosure Status
Disclosed
-
Nome do documento
Environmental management plan for central heating project on the North of Tiedong Yongan Road, Haicheng City
-
Palavras-chave
heat supply;monitoring plan;reporting system;sanitation department;central heating;pollutant discharge;environment management;pipeline network;heat source;environmental science;urban construction;mitigation measure;participation plan;gas;water;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.