Brazil - Tocantins Integrated Sustainable Regional Development Project : environmental assessment (Vol. 4) : Anexo 3 - Fichas técnicas e de avaliação socioambiental nos 56 trechos / CREMA (Português)

The Tocantins Integrated and Sustainable regional Development Project will cover 72 municipalities in the western half of the State. It will aim, on the one hand, at improving access of peripheral regions to the market through improving the road and transportation network and, on the other, at strengthening the capacity of the public sector to create an environment that enables and stimulates productive investments in the State and social and economic inclusion of all productive sectors and regions. Its objective is to improve the efficiency of transportation by road and the quality of selected state public services. The scope of the project relates to the challenges posed by two main components of state policies: socioeconomic integration and the logistic strategy to build a reliable transportation system. In this context, the goals of the PDRIS are improved access to public services and better road transport together with environmental conservation, elimination of critical bottlenecks, improved safety and stretches of access to the national transportation network. Direct potential impacts may come from rehabilitation and surfacing works. Such impacts are expected to be minor as are the impacts resulting from the construction phase. The project may have indirect impacts on land use, as well as on riparian vegetation in water crossings. In accordance with the potential impacts adequate mitigation and monitoring measures will be established.

Detalhes

  • Data do documento

    2011/11/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E2923

  • Nº do volume

    4

  • Total Volume(s)

    12 (Ver todos os volumes)

  • País

    Brasil,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2012/01/03

  • Disclosure Status

    Disclosed

  • Nome do documento

    Anexo 3 - Fichas técnicas e de avaliação socioambiental nos 56 trechos / CREMA

  • Palavras-chave

    accessibility, accessible locations, Archeological Sites, biodiversity, biodiversity conservation, capacity building, communities, compliance, crossing, crossings, culverts, decentralization, Description, design, Disclosure, drainage, environmental area, environmental assessment, environmental control, environmental impacts, environmental management, Environmental policies, environmental quality, environmental sector, environmental supervision, field visits, governance, Habitats, Highway, highways, Indigenous Peoples, infrastructure, Institutional Capacity, intervention, interventions, investments, land, land use, land use policies, legal framework, local communities, local development, management systems, markets, mitigation measures, Modernization, monitoring, Municipal, municipalities, national government, natural ecosystems, natural resources, oversight, pesticide, pesticides, pilot projects, plantations, policies, policy, populations, premises, Project, projects, public service, public services, Regional Development, Resettlement, road, road management, road network, road transport, Roads, rural transport, service, service delivery, services, Social Impact, sustainable development, traffic, traffic movement, traffic safety, transport conditions, transport management, water resources

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.