Skip to Main Navigation

India - Dam Safety Project (Inglês)

The objectives of the project are to: (i) strengthen the institutional framework for dam safety assurance in the Central Government and participating states; and (ii) to upgrade the safety features in and around selected dams to enhance their safety status as required, through remedial works, installation of flood forecasting systems and other basic safety facilities. The project will support: (a) technical assistance to a newly formed State Dam Safety Committee responsible for determining priorities among safety-related activities; (b) strengthening of the Dam Safety Organization, responsible for inspection, analysis, and reporting on the safety status of dams; (c) adding power backup systems, communications, all-weather access roads, and monitoring instrumentation and other basic safety facilities at priority sites; and (d) remedial works at approximately 33 dams where potential safety-related deficiencies have been identified, and other dams which will be identified during execution of the safety assurance program.

Detalhes

  • Data do documento

    1991/04/19

  • TIpo de documento

    Relatório sobre Avaliação do Pessoal

  • No. do relatório

    9391

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Índia,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    India - Dam Safety Project

  • Palavras-chave

    dam;dam safety;remedial work;cubic meters per second;average per capita income;large dam;remedial action;water resource development;loss of life;safety of dam;Standard Bidding Documents;variable interest rate;foreign exchange risk;review of dam;per capita gnp;planning and design;central water commission;total labor force;provision of equipment;cost financing;extreme climatic conditions;maximum flood discharge;machinery and equipment;dam safety information;weights and measure;area under irrigation;contract for work;construction of dam;drinking water supply;improved seed variety;procurement of work;case of failure;power generation facility;damage to property;cost recovery measure;water for irrigation;efficient resource allocation;water irrigation;high value crops;dam safety activities;availability of water;public sector activity;national dam safety;cost of land;high yielding variety;civil works;existing dam;flood forecast;safety status;safety assurance;hydrologic analysis;River basin;flood control;flood event;construction activities;Natural Event;budgetary allocation;adequate funds;project costing;dam maintenance;central agencies;storage dam;monsoon months;annual rainfall;appraisal mission;rural area;dam failure;construction supervision;institutional framework;reporting procedure;construction phase;safety requirement;retroactive financing;local bidder;institutional strengthening;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.