The purposes of the environmental assessment report are to: 1) forecast the short- and long-term adverse environmental impacts of the project; 2) adopt a series of protection measures so as to eliminate or/and minimize the adverse environmental impacts during the construction and operation periods; 3) establish the environmental facilities and carry out environmental monitoring as well as supervise the implementation of protection measures; and 4) calculate the investment needed for environmental protection. The study analyzes the impacts of the project on: forests, mineral resources, wildlife and conservation areas, scenery and aesthetics and farmland. The study also discusses the impacts of the environment on the transmission line such as: unfavorable geological conditions, high elevations, heavy icing, air pollution, and forest fires.
Detalhes
-
Autor
Sichuan Electric Power Company
-
Data do documento
1994/09/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E90
-
Nº do volume
2
-
Total Volume(s)
2
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Nome do documento
Ertan hydroelectric project : envrionmental assessment & resettlement
-
Palavras-chave
dam;reservoir;water;proper use of water;flood discharge;generating capacity;diversion works;demand for power;firm capacity;diversion tunnel;installed capacity;reservoir area;development of water;resettlement of people;Equipment for Transport;law and regulation;development of hydropower;Water and Land;migratory fish species;flow of traffic;prevention of pollution;water pollution prevention;kv transmission line;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.