The objectives of the Ferghana Valley Water Resources Management Project are: to improve the capacity for increased productivity of irrigated agriculture in the Ferghana valley by improving land and water management, and to improve safety and regulation of the Kayrakum dam and reservoir, thereby contributing to enhanced water management security and efficiency at the basin level. The original closing date was May 31, 2011, which was extended to May 31, 2013 when the additional financing was approved. It is to extend the closing date by an additional year to May 31, 2014. The extension is necessary to complete all works and strengthen the Water User Associations (WUAs). Construction works can only be implemented during a few months per year. As a result of this, some of the works have been delayed. It would be challenging to recover these delays as only a few months of effective construction time remain before the closing date, by which time it is unlikely that all works will be completed. This will be the second closing date extension for the project for a cumulative extension of three years.
Detalhes
-
Data do documento
2013/02/07
-
TIpo de documento
Documento do projeto
-
No. do relatório
72366
-
Nº do volume
2
-
Total Volume(s)
2
-
País
-
Região
-
Data de divulgação
2013/02/27
-
Disclosure Status
Disclosed
-
Nome do documento
Data sheet
-
Palavras-chave
land and water management;basin level;safeguard policy;Irrigated Agriculture;increase productivity;Safeguard Policies;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.