The objective of the Eastern Nile First Joint Multipurpose Program Identification (JMP1 ID) Project for Africa is to assist the three Eastern Nile (EN) countries in identification of the JMP1 investment package, through a series of studies and consultative activities that take into account economic, social and environmental sustainability issues in an integrated manner. The restructuring includes: (i) extension of the grant closing date from September 30, 2011 to December 31, 2012; (ii) revision to the project development objectives and the results framework to reflect recent changes in Ethiopia's plans for hydropower development on the Abbay/Blue Nile; (iii) revisions of project component costs; (iv) adjustments to the grant expenditure categories; and (iv) additional measures to reduce the risks of project delays and to enhance the quality of project outputs.

Detalhes

  • Data do documento

    2011/09/30

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    65055

  • Nº do volume

    1

  • Total Volume(s)

    2

  • País

    África,

  • Região

    África,

  • Data de divulgação

    2011/10/21

  • Disclosure Status

    Disclosed

  • Nome do documento

    Main report

  • Palavras-chave

    Environmental and Social Impact Assessment;economic and financial analysis;social and environmental;risk mitigation plan;water resource development;access to water;Resettlement action plans;panel of expert;development study;Recipient Executed Activities;capacity building program;sustainable water resource;critical watershed areas;large multipurpose dam;investment in water;flood prone area;water resource planning;stakeholder consultation;consultative activity;road map;hydropower development;information base;stakeholder involvement;gap filling;watershed management;data gaps;reservoir filling;mitigation measure;focus group;floodplain management;social studies;environmental data;international consultant;building consensus;technical committee;independent country;south sudan;social study;downstream impact;existing dam;large dam;cumulative impact;safeguard issue;preparatory work;Water Security;vulnerable group;dam safety;political issue;installed capacity;performance rating;audit compliance;analytical tool;field study;audit requirements;information gap;subsequent reports;assessment training;flood management;land use;management oversight;social safeguard;data gathering;grant funding;water saving;broad assessment;project delays;release schedule;environmental consideration;political development;Irrigation Modernization;water quality;future study;energy generation;government staff;critical habitat;agricultural productivity;livelihood improvement;benefit sharing;regional dialogue;project financing;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.