Skip to Main Navigation

Bolivia, Brazil - Gas Pipeline Project : environmental assessment (Vol. 4) : Environmental Management Plan and Indigenous Peoples Development Plan (Inglês)

The Gas Pipeline Project's objective is to transport natural gas produced in central Bolivia to major industrial centers in Brazil, opening a new market for existing Bolivian reserves of natural gas and bringing an additional source of power to Brazil. No displacement of households is anticipated. Air quality will be impacted by pollutants and emissions from construction activities. Water will be used to wet the construction areas, proper engines will be used and properly maintained. Best management techniques for blasting will be used to reduce ground disturbance, which may result in wind and water erosion. Erosion prevention, erosion control techniques, and revegetation will also be applied. Application of wetland and stream crossing techniques will mitigate the risks of scouring and bank erosion. To minimize sedimentation in water bodies and disturbance to wetland areas, controlled procedures for wetland and water body crossings will be implemented. Wells will be properly cased to avoid aquifer interaction. Spill prevention will reduce the potential of groundwater contamination. Reduction in surface water availability will be minimized by calculating surface flow and withdrawal rate and volume. Surface water contamination can be prevented by proper disposal of hazardous materials. Vegetation clearing will be restricted to designated areas to reduce elimination of forest canopy. Work force will be trained regarding fauna protection.

Detalhes

  • Autor

    Petroleo Brasileiro S.A. - Petrobas YPFB - Yacim

  • Data do documento

    1997/09/19

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E169

  • Nº do volume

    4

  • Total Volume(s)

    9

  • País

    Brasil,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2000/02/24

  • Nome do documento

    Environmental Management Plan and Indigenous Peoples Development Plan

  • Palavras-chave

    gas collection system;national oil and gas company;project sponsor;leachate collection system;environmental management system;international lending institutions;flora and fauna;erosion control measures;environmental compliance;wastewater treatment plant;hazardous materials management;community relation;level of compliance;air quality protection;environmental protection process;waste water treatment;waste management practice;sanitary waste management;standard of conduct;water quality protection;environmental education program;public information program;environmental protection requirements;employee training program;hazardous waste transport;protection of biodiversity;code of conduct;hazardous waste management;laws and regulation;mechanisms of coordination;access to communication;hazardous waste storage;disposal of waste;comprehensive environmental strategy;Sexually transmitted diseases;Check and Balances;environmental protection measures;natural resource protection;personal protective equipment;construction activities;environmental inspection;management contractor;compensation measures;cultural resource;environmental measure;construction period;community interaction;noise control;environmental requirement;access road;indigenous people;land title;Indigenous Peoples;sedimentation control;compensation plan;environmental issue;environmental monitoring;treated effluent;applicable regulation;effluent discharge;Gas Pipeline;pipeline route;environmental concern;sustainable management;environmental aspect;agricultural area;indigenous population;reporting procedure;affected communities;alarm system;pipeline corridor;environmental regulation;water bodies;construction area;indigenous group;environmental agreement;indigenous organization;construction phase;native vegetation;field activity;wetland area;monthly reports;project construction;permit conditions;environmental matters;disposal practice;waste treatment;public consultation;workers activity;environmental provision;sanitary wastes;compressor station;pipeline alignment;construction technique;worker safety;fill material;soil stability;road improvement;standard for method;safe disposal;work location;standard procedure;earth movement;water control;mitigation program;riparian area;inspection program;human remains;tropical disease;phone number;oversight function;environmental legislation;environmental agency;construction documents;ionizing radiation;construction practices;loan application;environmental work;compression station;work station;irrigation system;vegetation cover;visual inspection;environmental damage;disposal area;sandy soil;Temporary Work;surface drainage;public safety;cover material;landfill site;extensive study;sensitive species;routine inspection;compensatory program;compensatory mitigation;local public;pipeline construction;international community;civil engineer;remedial action;environmental sector;bank stabilization;Natural Resources;audit plan;environmental audit;storage tank;residential area;cathodic protection;property damage;monitoring program;evacuation procedure;emergency measure;emergency response;emergency equipment;reporting requirement;incident response;multiple sponsor;storage area;waste transportation;amazon river;satellite image;dry forest;access restrictions;small stream;amazon basin;protected flora;indigenous communities;social research;document distribution;security provision;fire department;Conflict Resolution;positive relationship;non-governmental organization;automotive equipment;indigenous community;water withdrawal;environmental permit;specific permit;legal assistance;community representative;mitigation plans;disposal procedures;respiratory protection;safety program;nonindigenous community;compensation management;fire protection;safety plan;environmental component;construction contractor;project impact;system program;construction work;study area;comprehensive strategy;safety law;environmental supervision;noise exposure;environmental review

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.